Task: Reconstruct a 110-kW outdoor switchgear, install a transformer of 110/27,5 kW and an indoor switchgear of 27,5 kW and 10 kW.

Design solutions:  In the territory of substation it was planned to install an equipment of 110/27,5 kW and two 110-10 Kw transformers, also to build the indoor switchgears of 27,5 kW and 10 kW, and to reconstruct the present PVP??? We designed the indoor and outdoor switchgears, PVP?? illumination system, lightening protection  and surge protection grounding. The suitability of existing conductors was evaluated. Short-circuiting calculations were made. We also created the system for electricity accounting and momentary data collection and transmission.

Client: AB “LIETUVOS GELEŽINKELIAI”

Year: 2015